Today@Dal
» Go to news mainCollege St closure for crane lift ‑ August 23
Posted by Facilities on
August 19, 2016
in
Facilities Management
On Tuesday, August 23, as part of the renovations to the Dentistry Building, mechanical equipment will need to be lifted via crane to the penthouse space. This will necessitate the closure of College Street between Robie and Carleton Street from 7 a.m. until 6 p.m. Ìý
There will be no street access during the closure. Pedestrians and traffic will be directed to either Carleton Street or Summer Street to access the open portion of College Street. Construction staff will be on site continuously during the shutdown. We apologize for any inconvenience.
Recent News
- Knee pain study needs participants
- Job postings
- Inventory Blowout at the Dal Bookstore
- Barbershop + Salonshop Talk
- Student Accessibility Centre to operate virtually on Monday, March 3rd
- Job postings
- 2024 tuition tax forms are now available through Student Accounts
- Flag lowering ‑ March 2